TRAFFIC SITUATION REPORT FROM APM TERMINALS AS AT 06/02/2018.

 

 

 

Dear Customer,

 

The Traffic situation in the last 24hrs has been relatively smooth and steady so far, as we had free flow of traffic from APMT exit gate towards EKO support Junction, likewise traffic flow within Lagos Port complex to NPA gate.

 

Since the start of shift, traffic situation has been hitch-free, although the spine road is experiencing traffic gridlock as loaded trucks and flatbed trucks are on stand still.

 

Over the past 24hrs, 692 trucks with a total of 2081 transaction were serviced of which 50% of the total transactions were imports while the rest were Export/Empties.

 

Kindly note that the closure of Ijora foot bridge and traffic diversion toward Leventis also a contributing factor thereby causing slow pace for traffic flow.

 

Please find pictures of the current situation.

Please reload

Recent Posts
Please reload

Archive
Please reload